Deutsche Bank Fire

$
0
0
Deutsche Bank Fire

In memory  of FF Joseph Graffagnino, L-5 detailed to E-24 (Posthumously promoted to Lieutenant) and FF Robert Beddia, E-24.

On September 11th, 2001, the Deutsche Bank located at 130 Liberty Street, suffered severe damage from the collapse of the World Trade Center and never reopened for business purpose. August 31st, 2004, Lower Manhattan Development Corp assumed ownership and Asbestos abatement and deconstruction was to take place at different locations within the building. No demolition permit for 130 Liberty was filed or issued, however, a series of alteration permits were filed and issued by NYCDOB. 

On Saturday August 18th, 2007, at 1536hrs, a Telephone Alarm reporting a fire on the scaffolding at 88 Greenwich Street, Box 0047 was transmitted. Initially 2 Engines, 2 Trucks and the Battalion were assigned, but due to subsequent numerous calls, Manhattan Dispatch filled out the assignment to 4 Engines, 2 Trucks, Rescue, Squad, Battalion & HazMat 1 (E-10, E-4, E-6, E-7, L-10, TL-15, Bn-1, Rescue 1, Squad 18). 10 Truck officer transmitted the 10-75 for heavy smoke from the upper floors of the Deutsche Bank with the corrected address of 130 Liberty Street. At 1541hrs, 10 Truck upgraded the box to a 2nd Alarm for fire through the skin of the high rise. At 1547hrs, Battalion 1 transmitted the 10-76(HiRise Commercial fire). Size up was 26 story hi-rise office building182x182 occupying 1 city block and as previously mentioned, undergoing asbestos abatement & demolition. The building was built in 1974, 38 stories tall prior to demolition. All interior elevators were out of service & exterior construction elevators were used to gain access to upper floors. The standpipe was reported by construction workers to be a 'dry system', however when fed from the street, water did not reach the fire floor. It was found that a section was missing in the sub level A. 

The 1st hoseline had to be stretched up the exterior of the building. It took 67 minutes from the initial transmission of alarm until a charged hoseline was in position on the 15th floor manned by Engine 24. The delay in water allowed the fire to extend from the 17th floor to the top 26th floor, also downward to the 16th, 15th, 14th, 12th & 5th floors. 

FF Graffagnino was found unconscious on the 14th floor at 1701hrs. He was removed to Downtown Beekman Hospital where he succumbed to his injuries. FF Beddia was found unconscious on the 14th floor at 1710hrs. He was also removed to Downtown Beekman Hospital where he succumbed to his injuries.